Being a UL 508A certified shop is more than a sticker. It's an ongoing commitment to the highest standards of safety and quality in the industry. It means our facility, our processes, and our engineers are regularly audited by UL to ensure every UL panel we build conforms to standards.

What this means for you:

  • Acceptance by Inspectors (AHJs)
  • Reduced Liability & Risk
  • Correct Component Sizing
  • Documented Safety Standards

Our 5-Point Testing Process

1

Component & BOM Verification

We cross-reference every component against your Bill of Materials (BOM) and schematics for accuracy before assembly begins.

2

Wire Tag & Terminal Check

Every wire is checked against its label, and every terminal is verified with for secure connections.

3

Full Point-to-Point Continuity Testing

We "ring out" every single wire run, from its source to its destination, to ensure no wiring errors. No exceptions.

4

High-Pot (Hipot) Testing

We perform dielectric withstand tests (as required) to ensure there are no shorts between phases or to ground, protecting your equipment and personnel.

5

Live Power-Up & I/O Simulation

The panel is powered on. We verify voltages (AC and DC) and simulate inputs and outputs to ensure your PLC, HMI, and I/O cards function perfectly.